What the bank checks first
For an under-construction purchase, the bank is assessing both your borrower strength and the project. A good borrower can still face a delay if the project, developer, panel bank route, or documentation is not suitable.
- Developer and project details matter.
- Progressive billing changes the cash-flow picture before keys are handed over.
- Your current debts and expected future instalments should be checked together.



